BIOGAS COMPRESSOR / CO2 RECOVERY
UVG132/ BVG30
UVG 132
LOCATION: LITHUANIA
FLUID: Biogas
POWER INSTALLED: 160 kW
INLET PRESSURE: 0,1 bar(g)
WORKING PRESSURE: Up to 12 bar(g)
FLOW RATE: 0<390<780 Nm3/h
AMBIENT TEMPERATURE: +3/+40 °C
BVG 30
LOCATION: LITHUANIA
FLUID: CO2
POWER INSTALLED: 45 kW
INLET PRESSURE: 0,5 bar(g)
WORKING PRESSURE: Up to 4 bar(g)
FLOW RATE: 0<150<300 Nm3/h
AMBIENT TEMPERATURE: +3/+40 °C
Two screw compressors for biogas upgrading located in Lithuania. The first unit supplies the biogas to the upgrading system, the second recirculates the remaining methane and carbon dioxide to obtain greater efficiency for its recovery through the upgrading system. Both compressors are open frame, installed inside container, designed for classificated Atex Zone 2, equipped with with electro-pneumatic by-pass system, fine filtration, temperature control and controlled by PLC.