UVG315/BVG75-Italy

uvg315

LocationItaly
FluidBiogas
Power installed315kW
Inlet pressure400 mbar(g)
Working pressureUp to 15.5 bar(g)
Flow rate0<1715<1827 Nm³/h
Ambient temperature+3/+40 °C

First screw compressor installed in series for biogas upgrading in a plant located in Italy. Its function is to feed the upgrading system with pretreated biogas. It is designed with open structure, installed inside a container, suitable for ATEX Zone 2. Fully equipped with heat recovery, fine filtration and temperature control system.

bvg75

LocationItaly
FluidBiogas
Power installed75kW
Inlet pressure500 mbar(g)
Working pressureUp to 4.5 bar(g)
Flow rate0<550<644 Nm³/h
Ambient temperature+3/+40 °C

Second screw compressor of the same line, dedicated to recirculating the remaining methane and carbon dioxide to optimize the efficiency of the upgrading process. This is also installed in a container, with open structure, suitable for ATEX Zone 2. Equipped with heat recovery system, fine filtration and temperature control for stable and safe performance.

The strength and expertise of one of the leading Italian industrial groups, with over 100 years of history and more than 25 years dedicated to the Green Energy sector.