UVG315

Location

Italy

Fluid

Biogas

Power installed

315kW

Inlet pressure

400 mbar(g)

Working pressure

Up to 15.5 bar(g)

Flow rate

0<1715<1827 Nm³/h

Ambient temperature

+3/+40 °C

First screw compressor installed in series for biogas upgrading in a plant located in Italy. Its function is to feed the upgrading system with pretreated biogas. It is designed with open structure, installed inside a container, suitable for ATEX Zone 2. Fully equipped with heat recovery, fine filtration and temperature control system.

ADI115

Location

Italy

Fluid

Biogas

Power installed

75kW

Inlet pressure

500 mbar(g)

Working pressure

Up to 4.5 bar(g)

Flow rate

0<550<644 Nm³/h

Ambient temperature

+3/+40 °C

Second screw compressor of the same line, dedicated to recirculating the remaining methane and carbon dioxide to optimize the efficiency of the upgrading process. This is also installed in a container, with open structure, suitable for ATEX Zone 2. Equipped with heat recovery system, fine filtration and temperature control for stable and safe performance.

Learn about our Case Studies

Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP

The strength and expertise of one of the leading Italian industrial groups, with over 100 years of history and more than 25 years dedicated to the Green Energy sector.
Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP