UVG75

Location

France

Fluid

Biogas

Power installed

90 kW

Inlet pressure

200 mbar(g)

Working pressure

Up to 11.5 bar(g)

Flow rate

0<240<480 Nm³/h

Ambient temperature

-10/+40 °C

 

Two screw compressors for the first stage of the biomethane production process, installed in France.
Designed for installation in outdoor environments classified ATEX Zone 2 (-10 °C / +40 °C), they are air-cooled and equipped with fine filtration, vent valve for depressurization, electropneumatic bypass system and PLC control. The units operate at the initial stage of the biogas upgrading process.

ADI115

Location

France

Fluid

Biomethane

Power installed

55 kW

Inlet pressure

11 bar(g)

Working pressure

Up to 80 bar(g)

Flow rate

0<325<480 Nm³/h

Ambient temperature

-10/+40 °C

Two two-stage reciprocating compressors for biomethane grid injection, located in France. These compressors are also installed in outdoor environments classified ATEX Zone 2 (-10 °C / +40 °C). Air-cooled, they are equipped with fine filtration, electropneumatic bypass system, silencers for noise reduction and PLC control. They operate in the second stage, managing the compression of biomethane for feeding into the grid.

Learn about our Case Studies

Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP

The strength and expertise of one of the leading Italian industrial groups, with over 100 years of history and more than 25 years dedicated to the Green Energy sector.
Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP