BVG160

LOCATION

Italy

FLUID

Biogas

POWER INSTALED

200 kW

INLET PRESSURE

200 mbar(g)

WORKING PRESSURE

Up to 8.3 bar(g)

FLOW RATE

0<1125 Nm³/h

AMBIENT TEMPERATURE

-20/+40 °C

Screw compressor for biogas upgrading, integrated into a Pressure Swing Adsorption (PSA) system, installed inside a 40″ container in Sicily. Designed to operate in ATEX Zone 2 and outdoor environmental conditions from -20°C to +45°C, it is equipped with suction dehumidification system and gas treatment, ensuring high performance, safety and operational continuity for biomethane production plants.

Learn about our Case Studies

Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP

The strength and expertise of one of the leading Italian industrial groups, with over 100 years of history and more than 25 years dedicated to the Green Energy sector.
Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP