BVG400

LOCATION

Brazil

FLUID

Biogas

POWER INSTALED

515 kW

INLET PRESSURE

300 mbar(g)

WORKING PRESSURE

Up to 8 bar(g)

FLOW RATE

0<1700<3400 Nm³/h

AMBIENT TEMPERATURE

-10/+40 °C

Two screw compressors for biogas upgrading and biomethane grid injection located in Brazil. The first unit (BVG 400) is dedicated to biogas upgrading. It is water-cooled and equipped with fine filtration, an electro-pneumatic by-pass system, and a bleed valve for depressurization to vent. Both compressors are PLC-controlled and designed in compliance with Brazilian market standards (INMETRO and NR10, NR12, NR13, NR17) for outdoor installation.

VG315

LOCATION

Brazil

FLUID

Biomethane

POWER INSTALED

400 kW

INLET PRESSURE

Up to 1 bar(g)

WORKING PRESSURE

Up to 8 bar(g)

FLOW RATE

0<2200<3400 Nm³/h

AMBIENT TEMPERATURE

-10/+40 °C

Two screw compressors for biogas upgrading and biomethane grid injection located in Brazil. The second unit (VG 315) is used for biomethane grid injection. It is air-cooled and also equipped with fine filtration, an electro-pneumatic by-pass system, and a bleed valve for depressurization to vent. Both compressors are PLC-controlled and designed in compliance with Brazilian market standards (INMETRO and NR10, NR12, NR13, NR17) for outdoor installation.

Learn about our Case Studies

Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP

The strength and expertise of one of the leading Italian industrial groups, with over 100 years of history and more than 25 years dedicated to the Green Energy sector.
Identity, evolution, values, challenges, and aspirations of a brand called ADICOMP