BIOGAS COMPRESSORS / RNG GRID INJECTION
UVG315/ VG250
2x UVG 315
LOCATION:Â SPAIN
FLUID: Biogas  Â
POWER INSTALLED:Â 550 hp (x2)
INLET PRESSURE:Â 0,73 psi(g)
WORKING PRESSURE:Â Up to 217,5 psi(g)
FLOW RATE:Â 0<1153<2305 SCFM
AMBIENT TEMPERATURE: +14/+104 °F
VG 250
LOCATION:Â SPAIN
FLUID: Biomethane Â
POWER INSTALLED:Â 430 hp
INLET PRESSURE:Â 0,73 psi(g)
WORKING PRESSURE:Â Up to 326,3 psi(g)
FLOW RATE:Â 0<330<651 SCFM
AMBIENT TEMPERATURE: +14/+104 °F
A complete automatic solution for biogas upgrading and biomethane grid injection consisting of:
– Two open frame screw compressors for biogas upgrading installed inside a container (40’) in Spain. Designed in compliance with the European standards for classified Atex zone 2. It is suitable for outdoor installation, water-cooled, outlet gas temperature control, fine filtration and controlled remote by PLC;
– One screw compressor for biomethane grid injection, in compliance with the Spain requirements for the biomethane grid injection. Designed for classified Atex Zone 2 for outdoor installation, water-cooled, outlet gas temperature control, fine filtration, equipped with silencers for reducing the noise level to 75 dB(A) at 1 meter and controlled remote by PLC.