BIOGAS COMPRESSORS / RNG GRID INJECTION
BVG132/ VG75
2x BVG 132
LOCATION: LATVIA
FLUID: Biogas
POWER INSTALLED: 200 hp (x2)
INLET PRESSURE: 4,4 psi(g)
WORKING PRESSURE: Up to 116 psi(g)
FLOW RATE: 0<374<698 SCFM
AMBIENT TEMPERATURE: +37,4/+104 °F
VG 75
LOCATION: LATVIA
FLUID: Biomethane
POWER INSTALLED: 125 hp
INLET PRESSURE: 79,8 psi(g)
WORKING PRESSURE: Up to 246,6 psi(g)
FLOW RATE: 0<389<779 SCFM
AMBIENT TEMPERATURE: +37,4/+104 °F
A complete automatic solution for biogas upgrading and biomethane grid injection consisting of:
– Two open frame screw compressors for biogas upgrading. They are water cooled and equipped with heat recovery, electro-pneumatic by-pass system, fine filtration and controlled by PLC;
– One open frame screw compressor for biomethane grid injection, It is water cooled and equipped with fine filtration, electro-pneumatic by-pass system and controlled by PLC. All compressors are designed for classified Atex Zone 2 for indoor installation (+37,4/+104 °F).
[contact_form]