
BIOGAS COMPRESSOR / CO2 RECOVERY
UVG132/ BVG30
UVG 132
LOCATION: LITHUANIA
FLUID: Biogas
POWER INSTALLED: 220 hp
INLET PRESSURE: 1,4 psi(g)
WORKING PRESSURE: Up to 174 psi(g)
FLOW RATE: 0<243<486 SCFM
AMBIENT TEMPERATURE: +37,4/+104 掳F
BVG 30
LOCATION: LITHUANIA
FLUID: CO2
POWER INSTALLED: 60 hp
INLET PRESSURE: 7,6 psi(g)
WORKING PRESSURE: Up to 58 psi(g)
FLOW RATE: 0<93<187 SCFM
AMBIENT TEMPERATURE: +37,4/+104 掳F
Two screw compressors for biogas upgrading located in Lithuania. The first unit supplies the biogas to the upgrading system, the second recirculates the remaining methane and carbon dioxide to obtain greater efficiency for its recovery through the upgrading system. Both compressors are open frame, installed inside container, designed for classificated Atex Zone 2, equipped with with electro-pneumatic by-pass system, fine filtration, temperature control and controlled by PLC.
[contact_form]
OTHER REFERENCES
UVG 90
France

UVG75/ADI115
France

UVG 55
Spain

UVG 132
Germany

UVG 132
USA

BVG 700
Brazil

UVG 315
Italy

UVG 160
Brazil

Model UVG 200
USA

UVG 22
France
