BIOGAS COMPRESSORS / RNG GRID INJECTION
UVG315/ VG250
2x UVG 315
LOCATION: SPAIN
FLUID: Biogas
POWER INSTALLED: 400 kW (x2)
INLET PRESSURE: 50 mbar(g)
WORKING PRESSURE: Up to 15 bar(g)
FLOW RATE: 0<1850<3700 Nmยณ/h
AMBIENT TEMPERATURE: -10/+40ยฐC
VG 250
LOCATION: SPAIN
FLUID: Biomethane
POWER INSTALLED: 315 kW
INLET PRESSURE: 50 mbar(g)
WORKING PRESSURE: Up to 22.5 bar(g)
FLOW RATE: 0<530<1045 Nmยณ/h
AMBIENT TEMPERATURE: -10/+40ยฐC
A complete automatic solution for biogas upgrading and biomethane grid injection consisting of:
– Two open frame screw compressors for biogas upgrading installed inside a container (40โ) in Spain. Designed in compliance with the European standards for classified Atex zone 2. It is suitable for outdoor installation, water-cooled, outlet gas temperature control, fine filtration and controlled remote by PLC;
– One screw compressor for biomethane grid injection, in compliance with the Spain requirements for the biomethane grid injection. Designed for classified Atex Zone 2 for outdoor installation, water-cooled, outlet gas temperature control, fine filtration, equipped with silencers for reducing the noise level to 75 dB(A) at 1 meter and controlled remote by PLC.
[contact_form]